Public Works CIP Project Update
Last updated September 2020
Rena Drive Drainage Improvements
Project ID# 002227A
Project Location
On the north side of Ulmerton Road just west of SR 693
Project Overview
The purpose of this project is to reduce flood frequency and severity in the Rena Drive drainage area and PAR facility as much as practicable. The project will consist of improvements to the stormwater conveyance system in the Rena Drive area which flows to Ulmerton Road.
The acquisition of 14 easements is required to construct this project. The design completion and construction start dates are contingent on successful acquisition of these easements. Currently 6 of 14 easements have been provided. This project is being administered by the Pinellas County Public Works Department.
Project Schedule
*NOTE* Entire schedule on hold until all easements are obtained.
- Design Start: August 2016
- Design End: September 2020
- Construction Starts: December 2020
- Construction Ends: December 2021
Project Contact
David Talhouk, E.I., ENV SP -- Project Manager
Public Works Planning and Engineering
14 S. Ft. Harrison Ave., 4th floor
Clearwater, FL 33756
(727) 464-3780