Environmental Management Banner Image Link to Pinellas County Home Page Link to Environmental Management Home Page
Home Special Events Publications Volunteers Contact Us Site Map

Environmental Topics

Environmental Management | Water Resources | Lake Tarpon Watershed

Environmental Home Page
Water Resources

Lake Tarpon Watershed
  What's New?
  History
  Reports

 Divisions
  Air Quality
  Coastal Management
  Code Enforcement
  Environmental Lands

  Water & Navigation
  Watershed Management

Location

300 South Garden Avenue
Clearwater, FL 33756
Phone: (727) 464-4425
Fax: (727) 464-4403

Web Site
© 2007 Pinellas County
All rights Reserved

 

CURRENT PROJECTS

Lake Tarpon Area 6 Stormwater Treatment

This project will modify an existing Florida Dept. of Transportation (FDOT) pond located in Lake Tarpon sub-basin 6.  This pond, located at the SE corner of U.S. 19 and E. Oakview Dr. in Tarpon Springs, drains 360 acres and outfalls to a wetland that drains though Anderson Park, into Lake Tarpon. 

An aluminum sulfate (alum) injection system will be constructed at the pond site.  Alum has been used successfully to improve the quality of surface waters by precipitating suspended solids out of the water column, reducing nutrient loading and improving water clarity in receiving water bodies.  Alum injection systems have been installed on many Florida lakes.

The addition of the alum injection system will provide an estimated reduction of pollutants as follows: 90% of TSS (14.13 tons/year), 85% of total phosphorus (0.66 tons/year), and 50% of total nitrogen (2.53 tons/year).

This project is in the preliminary design phase.  Construction is scheduled to begin in the fall of 2006.

Photograph of area 6 Lake Tarpon stormwater treatment. Photograph of area 6 Lake Tarpon stormwater treatment.
Lake Tarpon stormwater treatment Area 6 project. Lake Tarpon stormwater treatment Area 6 project.

Lake Tarpon Area 23 Stormwater Treatment

An alum injection system is proposed for this site.  This sub-basin has one of the highest nutrient loading values into Lake Tarpon. 

The addition of the alum injection system will provide an estimated reduction of pollutants as follows: 90% of TSS (0.71 tons/year), 90% of total phosphorus (0.05 tons/year), and 40% of total nitrogen (0.67 tons/year). This project is scheduled to begin in 2006 with the selection of a consultant and preliminary design.

Lake Tarpon Area 63 Stormwater Treatment

An alum injection system is proposed for this site, at the George St. canal at Old East Lake Rd. 

The addition of the alum injection system will provide an estimated reduction of pollutants as follows: 90% of TSS (2.66 tons/year), 90% of total phosphorus (0.20 tons/year), and 40% of total nitrogen (0.20 tons/year). This project is scheduled to begin in 2006 with the selection of a consultant and preliminary design.

Photograph of Lake Tarpon site 23 project. Photograph of Lake Tarpon site 63 project.
Lake Tarpon site 23 project. Lake Tarpon site 63 project.

 