Lake Tarpon Area 23 Stormwater
Treatment
An alum injection system is proposed
for this site. This sub-basin
has one of the highest nutrient loading
values into Lake Tarpon.
The addition of the alum injection
system will provide an estimated reduction
of pollutants as follows: 90% of TSS
(0.71 tons/year), 90% of total phosphorus
(0.05 tons/year), and 40% of total
nitrogen (0.67 tons/year). This project
is scheduled to begin in 2006 with
the selection of a consultant and
preliminary design.
Lake Tarpon Area 63 Stormwater
Treatment
An alum injection system is proposed
for this site, at the George St. canal
at Old East Lake Rd.
The addition of the
alum injection system will provide
an estimated reduction of pollutants
as follows: 90% of TSS (2.66 tons/year),
90% of total phosphorus (0.20 tons/year),
and 40% of total nitrogen (0.20 tons/year).
This project is scheduled to begin
in 2006 with the selection of a consultant
and preliminary design.
|